Consistent Quality. We strive to do things well and provide a competitive, quality product.

Made with XLERPLATE® steel

Heavy duty high definition plasma used by Dimitriou Fabrications in their fabricating workshop

Australian mines prefer Australian loaders

Dimitriou Fabrications has established a strong reputation in the mining and construction industries for its world-class products. Read more

Bridge spans and trestles at Port Headland, manufactured using Grade 350 and 350Z XLERPLATE® steel. These will be used to construct the Pilbara rail network.

Pilbara project continues long association

PIC is marking its 40th anniversary this year by continuing to supply key components to major resource projects. Read more

Nepean Engineering's Narellan workforce uses Grade 350 XLERPLATE® steel to produce its highly regarded buckets for the earth moving industry.

A bucket load of XLERPLATE® steel

2008 was a record year for Nepean Engineering. The company fabricates buckets and log grapples for the earth moving and forestry industries. Read more

Nearly 400 tonnes of Grade 7-490AL50 modified XLERPLATE® steel has gone into construction of propane vessels, which were designed by WE Smith.

WE Smith Supplies Pressure Vessels For Woodside's Pluto LNG Project

WE Smith is fabricating two sets of butted kettle heat exchangers and a propane re-boiler for Woodside's Pluto LNG Project. Read more

United Group Resources delivers for BP. Using more than 200 tonnes of 460N Grade (normalised) XLERPLATE® steel

United Group Resources Delivers For BP

United Group Resources has fabricated and delivered a major process unit for the BP refinery in Kwinana, WA. Read more

Over 8,000 tonnes of XLERPLATE® steel is being used to construct a new wharf, ship loader, piling, headstocks and railtrack for the Abbot Point coal Terminal in Queensland.

Port Extension Boosts Queensland's Coal Export Capability

Ports Corporation of Queensland (PCQ) is using over 8,000 tonnes of XLERPLATE® steel in a major expansion of its Abbot Point Coal Terminal. Read more

RPG Australia will use over 6,500 tonnes of Grade 350 XLERPLATE® steel in the construction of wind towers at Lake George, NSW, which when finished will stand approximately 80 metres high with a base diameter of 4.3 metres.

RPG Australia Secures Capital Wind Farm Contract

RPG Australia has secured a contract to manufacture wind towers for the Capital Wind Farm at Lake George in New South Wales. Read more

Major Metals Queensland has constructed two gigantic steel caissons from Grade 350 XLERPLATE® steel for the Tugun desalination plant.

Desalination Plant. Something To Drink To

Major Metals Queensland has constructed large steel caissons, pivotal to the Gold Coast desalination project being built at Tugan. Read more

More than 200 tonnes of XLERPLATE® steel will make up the 400 tonne boat lifter commissioned by Norship Marine.

Boat Lift Boosts Cairns' Business

The latest addition to a Far North Queensland ship building company is a 400 tonne, three storey high mobile boat lift which will benefit at least three local businesses. Read more

Bogie frames heading for Kazakhstan manufactured from Grade 400 XLERPLATE® steel.

United Group Rail Keeps Kazakhstan On The Rails

Kazakhstan might not be the most obvious place for an Australian company to export, but this landlocked nation bordered by Russia and China is an important part of United Group Rail's business. Read more